Adaptation Actions
381 - 400 of 506
367 - Ensure proper drainage: outflow needs direction away from infrastructures and towards a safer place
368 - Check that hand pumps are properly sealed (at top of bore hole) to prevent contamination and back leakage
369 - Fully check the performance of new systems 3 months – 1 yr after construction
370 - Build homes with cement around the base so as to prevent inundation
371 - Build homes that are raised above ground level to prevent household inundation during floods
372 - Build walls and sea walls to prevent storm surge related flooding
373 - Develop health guidelines on consumption and contamination by air pollution and ash
374 - Construct proper timber drying facilities to ensure timber is properly dried during rainy periods
375 - Apply chemical treatments for mould
376 - Plan and promote forest eco-tourism activities for dryer areas during prolonged rainy periods
377 - Design forest tourism activities that are rain-proof (indoor activities- greenhouses and indoor botanical gardens)
378 - Make personal pesticides available to tourists in mosquito-prevalent areas
379 - Construct tourism facilities (bungalows) with durable non-weathering timber species (not likely to rot)
380 - Advise tourism operators on differing weathering properties of various forest products
381 - Discourage burning of grasslands or marginal vegetation that holds soil
382 - Practice contour cropping/terracing
383 - Encourage rehabilitation of bare land and areas subject to soil erosion.
384 - Utilize site capture crops to quickly revegetate bare slopes
385 - Utilize cover crops to hold soil
386 - Utilize barrier crops to trap and prevent sediments from eroding